Circular Supply Proposal

What this document is

The commercial structure of one Circular Supply Agreement for Hillsboro and Hill County — deployment from 100 to 2,000 TPD, the Beneficiation Fee, the Circular Royalty™, risk and timeline.

Three things this document says
  1. Phase Initial at 100 TPD (36,500 TPY) is the entry point; the CSA scales to 2,000 TPD without renegotiating commercial terms.
  2. One CSA, no election: the County pays $100/ton and receives a Circular Royalty™ from 13 months after the first fee payment.
  3. Zero County capital at any phase; Phase Medium and beyond depend on regional partnership volumes that are not yet contracted.
Carbotura · Circular Advantage Program · Circular Supply Proposal

Hillsboro, Texas
Circular Supply Proposal

A 30-year Circular Supply Agreement converts Hill County’s disposal spend on the I-35 corridor into a royalty return, at zero County capital.

Document: Stage 1 Circular Supply Proposal Prepared for: City of Hillsboro / Hill County, Texas Date: April 2026 Basis: Registry LOCKED WITH WARNINGS April 2026; FWDC $100/ton blended ESTIMATED; fee and royalty ESTIMATED on Carbotura standard parameters; site options PROVISIONAL

§1 Transaction Structure

§1.0Regulatory Predicate Transition (RPT)

Regulatory Predicate Transition — both parties commit to the dewaste pathway

Advanced Circular Manufacturing is a manufacturing process, not a waste-management activity. Microwave Catalytic Reforming operates in an anoxic, oxygen-free, sub-atmospheric environment — mechanistically incompatible with combustion or biological degradation. ACM does not fit within the waste domain and does not operate under waste-domain statutes. The Regulatory Predicate Transition (RPT) — also framed as the dewaste pathway — is the coordinated regulatory shift from legacy disposal-predicate statutes onto manufacturing-predicate classifications. 100% elemental recycling of the municipal material stream requires this transition. Manufacturing NAICS 325180 · 325998 · 327992 · 331110 · 331314 · 331492 (6-code ACM set) plus EPA RCRA §1004(27) / 40 CFR §261.2(e) exclusion pathway in the US; ISIC Rev.4 20-25 + UN CPC 89 internationally. In many jurisdictions the required authorities already exist in latent form within existing statutes; in others the transition requires primary-authority amendments. The Joint Working Group phase includes a regulatory engagement workstream to shepherd the RPT alongside site permitting. Both parties commit to the RPT pathway. Carbotura brings the process-classification evidence, regulatory engagement expertise from prior ACM deployments, and the legal-technical framework. The counterparty brings the standing to engage the local regulator, the political mandate for the transition, and — where applicable — legacy statutory authorities that can be re-instrumented for manufacturing use. The endpoint is categorical: manufacturing classification across all permitting, licensing, and regulatory contexts. Interim bridging authorities may apply during the transition.

§1.1Commercial Structure

The proposed instrument is a 30-year Circular Supply Agreement (CSA) between Carbotura and the City of Hillsboro / Hill County (anchor counterparty), with optional CSA addenda for Fort Worth and Waco partnership entry under separately negotiated instruments.

Carbotura's commitments under the CSA

  • Build, own, operate, and maintain the ACM facility for 30 years
  • Fund 100% of capital construction (BOO structure)
  • Pay Circular Royalty™ equal to 120% of contemporaneous Beneficiation Fee per ton, with +1pp/year escalator, paid 13 months in arrears on a rolling monthly basis
  • Deliver designed environmental performance (carbon-negative net operations; near-zero landfill diversion of committed streams)
  • Pursue the Regulatory Predicate Transition (RPT) pathway jointly with the counterparty throughout the CSA term

Counterparty's commitments under the CSA

  • Direct committed feedstock streams to the ACM facility
  • Pay Beneficiation Fee per ton delivered ($100/ton base, 2.5%/year escalator)
  • Honor 30-year CSA term subject to standard force majeure and cure provisions
Decision window

To preserve Phase Initial COD Q2 2028, the procurement decision (CSA execution authorization) is required by Q2 2026 — effectively concurrent with engagement start. Each six-month slip past Q2 2026 moves Phase Initial COD month-for-month and reduces Year-2 Royalty receipts by approximately $1.8–$2.2M. At Phase Expanded scale, each six-month slip costs $25–35M cumulative Royalty.

§2 Deployment Architecture

§2.1Phase Configuration Table

PhaseTPDModulesTPY% Inferred ResourceCOD Target
Phase Initial100136,5002%Q2 2028
Stage 2200273,0004%Q3 2029
Phase Medium4004146,0008%Q4 2030
Stage 41,00010365,00020%Q1 2032
Phase Expanded2,00020730,00040%Q2 2033

Module math: ceil(TPD/100). All CODs anchored to T0 = Q2 2026 per Carbotura standard deployment schedule.

§2.2BOO Capital Structure

Zero counterparty capital expenditure. Zero construction debt on County books. Zero operating liability post-COD. Hill County's sole financial obligation under the CSA is the per-ton Beneficiation Fee. Carbotura funds 100% of project cost through institutional capital under separate SPV structuring. The County's general fund, debt capacity, bonding authority, and credit rating are unaffected.

§2.3Feedstock Stream Coverage by Phase

StreamPhase InitialPhase MediumPhase ExpandedAccess Status
Hill County MSW (residential + commercial)✓✓✓Immediate
Hill County C&D residuals✓✓✓Immediate
Hill County industrial / commercial special✓✓✓Immediate
Hill County WWTP biosolidsoptional✓✓Conditional
Ellis / Johnson County (adjacent)partial✓Conditional
Fort Worth metro extension✓Partnership pending
Waco metro extension✓Partnership pending

§2.4Site Candidate Analysis

Three priority zones identified within Hill County and the immediate I-35 corridor. Final site selection deferred to Term Sheet phase verification geotechnical, zoning, and environmental review.

Priority 1 Finding

The North Hillsboro I-35 Industrial Corridor (P1) optimizes three logistic and commercial criteria simultaneously: (a) I-35 frontage for inbound feedstock from any Hill County or partner-jurisdiction origin; (b) ~10-mile proximity to Republic Itasca LF supporting alternative-disposition negotiations and route convergence; (c) industrial zoning consistent with NAICS manufacturing classification under the Regulatory Predicate Transition (RPT). P2 is favored only if Hill County base-load feedstock-haul minimization drives selection. P3 is favored only if Phase Expanded with Waco partnership materializes early.

Complete Site Candidate Matrix
PriorityZoneAcreageZoningLand AuthorityCo-location AdvantageKey Consideration
P1North Hillsboro I-35 Industrial Corridor80–150 acM-1 / M-2 IndustrialCity of Hillsboro + privateI-35 frontage; 10mi from Republic Itasca LF; central feedstock originsParcel availability to confirm during Term Sheet phase verification
P2Itasca Industrial — adjacent Republic Itasca LF40–80 acIndustrialHill County / City of Itasca / privateAdjacent to existing regional disposal; minimal feedstock haulSmaller acreage; zoning compatibility
P3South Hillsboro / I-35 × SH-22 Interchange100–200 acMixed use / IndustrialHill County / privateInterchange access for Waco corridor; greater acreage flexibilityAquilla aquifer proximity — environmental review required

§2.5Finding: Phase Initial Feedstock Sufficiency

Finding

Phase Initial 100 TPD is fully supportable from Hill County feedstock streams currently classified IMMEDIATE. No third-party feedstock partnership, no inter-jurisdictional CSA, and no contract-renegotiation precondition required. Stage 2 through Phase Expanded are independently negotiable additions — each unlocks at the County's pace, with no forced sequencing.

Interactive map requires a Google Maps API key.

Set GOOGLE_MAPS_API_KEY in config.js.

Zone cards remain fully functional without a map key.

§3 Economic Structure — Beneficiation Fee

FWDC planning basis: $100/ton blended (Hillsboro Triangle 50-mile catchment) — Estimated. Hill County rural ~$82/ton; Fort Worth metro ~$108/ton; Waco metro ~$95/ton; weighted by phase ramp. Full FWDC confirmation deferred to Term Sheet phase verification.

Beneficiation Fee formula: MAX($100, MIN($150, FWDC − $5))

ParameterValueSource
FWDC blended planning basis$100 / tonEstimated
Beneficiation Fee floor$100 / tonCarbotura standard parameters
Beneficiation Fee ceiling$150 / tonCarbotura standard parameters
Hillsboro Triangle Beneficiation Fee — Year 1$100 / tonVerified — user-confirmed
Annual escalator2.5% / yearCarbotura standard
PhaseTPYTMC / ton at Phase Y1Annual TMC Obligation
Phase Initial (facility Y1)36,500$100.00$3,650,000
Stage 2 (facility Y3)73,000$105.06$7,669,000
Phase Medium (facility Y5)146,000$110.38$16,116,000
Stage 4 (facility Y7)365,000$115.97$42,329,000
Phase Expanded (facility Y9)730,000$121.84$88,943,000

ESTIMATED — derived from FWDC planning basis and Carbotura standard parameters. Final TMC schedule confirms at CSA execution following Term Sheet phase verification FWDC verification.

§4 Circular Royalty™

Royalty(m+13) = TMC(m) × Royalty_Rate(m)

ParameterValue
Base royalty rate (Year 1)120% of contemporaneous Beneficiation Fee
Annual royalty rate escalator+1 percentage point per year
Beneficiation Fee escalator2.5% / year
Payment lag13 months
Payment basisRolling monthly
CSA term30 years from Phase Initial COD
Pre-royalty periodMonths 1–12 (Year 1)

"Gross cost displacement is quantified separately from Circular Royalty™ cash flow.

"At steady state, the Circular Royalty™ is designed to exceed the Beneficiation Fee on a per-ton basis."

"Circular Royalty™ payments begin 13 months after corresponding Beneficiation Fee payments and ramp to full run-rate on a rolling basis."

Fiscal Period Distinction

Pre-Royalty · Year 1 · Months 1–12
Avoided Disposal: ~$3.0M
Beneficiation Fee paid: −$3.65M
Circular Royalty™: $0 — 13-month lag
Royalty Ramp · Year 2 · Month 13+
Avoided Disposal: ~$3.07M
Beneficiation Fee paid: −$3.74M
Circular Royalty™: +$4.38M rolling
Steady State · Year 30
Avoided Disposal: ~$8.07M
Beneficiation Fee paid: −$7.47M
Circular Royalty™: +$10.83M
Gross Fiscal Position — Avoided Disposal / Beneficiation Fee / Circular Royalty™
Three independent gross streams shown separately.
Carbotura Circular Royalty™ formula · $100/ton TMC Year 1 · $82/ton FWDC Hill County · 120% base · +1pp/yr escalator · 13-month lag · Phase Initial 36,500 TPY · ESTIMATED
30-Year Fiscal Schedule — Full Detail
YearAvoided Disposal / tonTMC Paid / tonRoyalty RateRoyalty Received / ton
1$82.00−$100.00120%$0.00 (lag)
2$84.05−$102.50121%+$120.00
3$86.15−$105.06122%+$124.03
5$90.50−$110.38124%+$132.46
10$103.00−$124.89129%+$156.25
20$131.00−$159.85139%+$215.72
30$167.00−$204.64149%+$296.77

Royalty figures are amounts received. The royalty is paid 13 months in arrears, so the figure shown for a year is earned on the previous year’s delivered tonnage.

§5 Risk Register

#RiskKey DriverBearerMitigationResidual
1FWDC verification$100/ton blended ESTIMATEDBoth partiesTerm Sheet phase verification FWDC audit; TMC floor protects downsideLow
2Technology performanceMCR commercial-scale operating performance vs. designCarbotura (BOO)Performance guarantees in CSA; conversion efficiency thresholds; reserve accountLow
3Timeline slippageTerm Sheet phase verification, permitting, financing, constructionBothStandard 24-month construction window with cure provisionsMedium
4Republic Services concentration3 of 4 catchment landfills under single operator; escalation exposureCounty (incumbent contracts)Staggered phase scaling; CSA hauler-direction provisionsMedium
5Competitive procurementOther waste-conversion operators may approach catchment communities during windowBothRPT-aligned first-mover position; 30-year exclusivity in CSALow
6PFAS regulatoryFederal EPA PFAS rules (2026–2027) may step-change stream disposal costsCounty (State A exposure); Carbotura (feedstock spec)ACM designed for PFAS destruction; feedstock spec in CSALow

§6 Timeline

MilestoneTarget DateT0 OffsetNotes
T0 — Engagement startQ2 2026T0ESTIMATED — confirmation pending
Procurement decision deadline (CSA authorization)Q2 2026T0Concurrent with engagement start to preserve Phase Initial COD Q2 2028
Term Sheet phase verification completeQ3 2026T0 + 3moFWDC audit, geotechnical, zoning, permits framework
Phase Initial construction startQ4 2026T0 + 6moFollowing financing close
Phase Initial COD (100 TPD)Q2 2028T0 + 24moFirst feedstock delivery; Year 1 TMC begins
First Circular Royalty™ paymentQ3 2029T0 + 37mo13 months after Phase Initial COD; rolling monthly thereafter
Stage 2 COD (200 TPD)Q3 2029T0 + 39moFirst scaling step
Phase Medium COD (400 TPD)Q4 2030T0 + 54mo4 modules
Stage 4 COD (1,000 TPD)Q1 2032T0 + 69moConditional on Tier 3 partnership
Phase Expanded COD (2,000 TPD)Q2 2033T0 + 84moFull 20-module deployment; 60mo from Phase Initial COD
CSA term endQ2 2058T0 + 30yr30-year CSA from Phase Initial COD

Hard external deadline framing: No regulatory hard deadline applies. Procurement Decision Deadline = Phase Initial COD − 24 months = Q2 2026. Slippage past Q4 2026 moves Phase Initial COD into 2029. Deferral cost: each 6-month slip ≈ $1.8–$2.2M Year-2 Royalty foregone (Phase Initial scale).

§7 Community Value Stack

Required separation

County fiscal effects (Royalty receipts, cost displacement) and regional economic effects (employment, regional GDP) are distinct categories — never combined into a single benefit line. §7.1 is County treasury effects. §7.2 is regional economic effects.

§7.1County Fiscal Effects

  • Beneficiation Fee paid (outflow): Phase Initial Year 1 at $3.65M annual; escalates with phase ramp.
  • Circular Royalty™ received (inflow): $0 Year 1 (13-month lag); ~$4.4M Year 2 (Phase Initial); ~$114M annual at Phase Expanded steady-state.
  • Avoided disposal cost (cost displacement, not treasury inflow): ~$3.0M Year 1 → ~$75M+ annual at Phase Expanded.
  • 30-year cumulative Circular Royalty™ (Phase Initial only): ~$218M
  • 30-year cumulative avoided disposal cost (Phase Initial only, reported separately): ~$165M
  • 30-year combined fiscal benefit (full Phase Expanded with Tier 3 partnerships): ESTIMATED ~+$3B+
  • Capital obligation: $0.

§7.2Regional Economic Effects

These flow to the Hillsboro Triangle economy — not to the County treasury.

PhaseDirect FTEIndirect Jobs (×2.5)Annual Regional Economic Impact
Phase Initial2563~$4M
Phase Medium70175~$14M
Phase Expanded280700~$58M

Plus property tax base addition of $75M–$1.17B (phase-dependent capital improvement) for the host jurisdiction.

§8 Why This Works in Hillsboro

  1. Volume alignment. Hill County alone generates ~100 TPD — exactly matching Phase Initial design capacity. The 50-mile catchment plus Tier 3 universe (~5,000 TPD inferred resource) provides the scaling pathway to 2,000 TPD without any single counterparty being load-critical to Phase Expanded.

  2. Infrastructure alignment. Hillsboro's I-35 position is the structural logistics anchor for the entire Hillsboro Triangle. Priority 1 site (North Hillsboro I-35 Corridor) optimizes inbound feedstock haul from any Hill County or Tier 3 origin and is co-located on the same corridor already concentrating regional waste flow toward Republic Itasca Landfill.

  3. Contract timing alignment. No regulatory hard deadline forces an externally driven schedule. Phase Initial commits no partnership negotiation, allowing the County to authorize on its own calendar. The procurement window is structural — driven by regional ACM siting capacity and Republic Services' escalation trajectory.

  4. Policy alignment. The Regulatory Predicate Transition (RPT) (§1.0) anchors the engagement to manufacturing classification under NAICS 325180, 325998, 327992, 331110, 331314, 331492. Texas TCEQ has not issued state-level rules incompatible with this classification, and manufacturing classification (NAICS 31–33) is the controlling federal basis.

  5. Regulatory driver. Federal RCRA classification timing creates a window for first-mover communities under the RPT. Republic Services' three-of-four-landfill concentration in the catchment creates structural counterparty-risk exposure that intensifies with each annual rate escalation cycle.

  6. Economics specificity. Beneficiation Fee at $100/ton derives from the Hillsboro Triangle blended FWDC planning basis ($100/ton ESTIMATED, weighted by phase ramp across Hill County, Ellis, Johnson, S. Tarrant, McLennan, and partnership-extension sub-catchments). Calibrated to this community's actual disposal-cost trajectory — not a generic figure.

★ Basis of Presentation

This document defines the commercial structure, deployment architecture, fiscal terms, and community value of the proposed 30-year Circular Supply Agreement with Hill County, Texas. Each parameter is classified by confidence tier. Final values confirm during Term Sheet phase verification following procurement decision authorization.

ParameterValue AppliedBasisConfidence
Beneficiation Fee — Year 1$100/tonUser-confirmed at engagement intakeLocked
FWDC blended planning basis~$100/tonTexas regional gate rates + collection increment — modeledEstimated
Phase Initial 100 TPD / 36,500 TPYCOD Q2 2028User-confirmed scaling pathwayLocked
Phase Expanded 2,000 TPD / 730,000 TPYCOD Q2 2033 · Conditional on Tier 3 partnershipsUser-confirmed; partnership conditionality notedLocked
Royalty formula and parameters120% base · +1pp/yr · 13mo lag · rolling monthlyCarbotura standard parameters — lockedLocked
T0 anchorQ2 2026Carbotura standard deployment schedule; confirmation pendingEstimated
Employment figures25 / 70 / 280 direct FTE (PI / PM / PE)Carbotura standard FTE-per-TPD ratios applied to Hillsboro phasingEstimated
Site candidates (P1, P2, P3)Three I-35 corridor zones; P1 North Hillsboro preferredGeographic and zoning analysis; pre-Term Sheet phase verificationProvisional
Operator verificationRepublic Services ×3, WM ×1, Frontier Waste ×1Google Places + NYSE filings, April 2026Verified

Unresolved Data Gaps

  • Hill County stream-specific FWDC — Frontier Waste and Republic Services contract terms; resolved during Term Sheet phase verification.
  • T0 confirmation — procurement decision authorization date.
  • Tier 3 partnership entity commitments (Fort Worth / Waco) — inter-jurisdictional coordination 2026–2028.
  • Texas TCEQ permit timeline — pre-application engagement during Term Sheet phase verification.

Confidence tiers: Locked = user-confirmed or contractually standard Verified = sourced to named public record Estimated = Carbotura-modeled with stated methodology Provisional = pre-Feasibility-Study placeholder.

Was this circular supply proposal useful?
Indicative reference only — not an offer. All financial figures are Carbotura planning-basis estimates unless marked VERIFIED. The blended FWDC of $100/ton is ESTIMATED across the I-35 corridor — Hill County gate rates verify at $82/ton, Fort Worth metro at $108/ton and Waco metro at $95/ton. The Beneficiation Fee of $100/ton and all Circular Royalty™ figures are ESTIMATED on Carbotura standard parameters and subject to Term Sheet phase verification. Site options are PROVISIONAL. Phase Medium and Phase Expanded volumes assume regional partnership volumes that are not yet contracted. Assumption Registry LOCKED WITH WARNINGS, April 2026. The Beneficiation Fee and the Circular Royalty™ are independent gross transactions and are not netted or combined anywhere in this package.