Hillsboro · Manufacturing Feedstock System Overview
Feedstock System Assessment

What this document is

Hill County’s existing disposal system — volumes, I-35 corridor routes, gate rates and operator concentration — read through to the feedstock stream Advanced Circular Manufacturing addresses.

Three things this document says
  1. Roughly 100 TPD of manufacturing feedstock supports Phase Initial directly.
  2. Corridor gate rates verify at $82–108/ton; the blended $100/ton planning figure is ESTIMATED and requires audit.
  3. A single dominant operator handles the county’s residual, with no competing gate on the corridor.
Carbotura · Circular Advantage Program · Feedstock System Assessment

Hillsboro, Texas
Feedstock System Assessment

One operator, one corridor, ~100 TPD — the feedstock stream that Advanced Circular Manufacturing converts into manufactured materials.

Document: Stage 1 Feedstock System Assessment Prepared for: City of Hillsboro / Hill County, Texas Date: April 2026 Basis: Operator gate rates verified via facility lookup; collection composition and blended FWDC ESTIMATED

§0 What This Means

  • Structural disposal pinch point. Hillsboro sits on I-35 between four major regional landfills — Republic Itasca (10mi north), Republic Mexia (52mi southeast), WM Lacy Lakeview (38mi south), Republic Fort Worth Southeast (58mi north). Republic Services controls three of these four facilities.
  • Feedstock universe is layered. Hill County alone generates ~100 TPD of total feedstock (sufficient for Phase Initial). The 50-mile natural catchment generates ~1,600 TPD. Optional partnerships with Fort Worth and Waco extend addressable volume to ~5,000 TPD inferred resource.
  • Disposal cost varies sharply across the catchment. Hill County rural blended ~$82/ton; Fort Worth metro ~$108/ton; Waco metro ~$95/ton. The collector-facing Full Waste Disposal Cost is materially above the Republic gate tipping fee — collection, transport, and operator margin together account for most of the per-ton cost.
  • No hard regulatory deadline. Unlike communities operating under landfill closure orders, Hillsboro's procurement window is structural — driven by Republic Services pricing power, regional capacity tightening, and federal RCRA classification timing — not by a binding regulatory event.
  • Operator concentration is the single largest counterparty risk. Three of four catchment-area MSW landfills are Republic-operated. Future disposal contract escalation, capacity allocation, or pricing policy from a single corporate counterparty represents the most material structural exposure to the County and any partner municipalities.

§1 Feedstock Profile

§1.1Capability Finding

Capability Finding

ACM is capable of processing every material stream Hillsboro's catchment generates. Every classification in this section reflects an access constraint — not a capability limit. The barrier to any stream is contractual, logistical, or regulatory — never technical.

§1.2Feedstock Volume Table

Stream TPY TPD Current Disposition Operator Access Class. ACM Phase
Tier 1 — Hill County Anchor (pop. ~36,500)
Hill County MSW (residential + commercial)~25,500~70Republic Itasca LandfillFrontier Waste / Republic ServicesImmediateInitial
Hill County C&D residuals~5,500~15Republic Itasca + regional C&DMixed haulersImmediateInitial
Hill County industrial / commercial special~3,650~10Mixed regional disposalMixedImmediateInitial
Hill County WWTP biosolids~1,825~5Land application / co-disposalCity of Hillsboro WWTPConditionalInitial
Hill County subtotal~36,475~100Initial
Tier 2 — 50-mi Natural Catchment (additional pop. ~660,000)
Ellis County (Waxahachie, Midlothian, Ennis)~150,000~410Multiple regional disposalWM, RepublicConditionalStage 2 / Medium
Johnson County (Cleburne, Burleson partial)~140,000~384MultipleWM, Republic, City of CleburneConditionalStage 2 / Medium
Bosque + Navarro + N. McLennan + N. Limestone~110,000~301Corridor disposalMixedConditionalMedium
S. Tarrant County (Mansfield, S. Arlington partial)~150,000~411Republic FW Southeast LandfillRepublic Services + City of FWConditionalStage 2 / Medium
50-mi catchment subtotal~550,000~1,506ConditionalStage 2 → Medium
Tier 3 — Conditional Regional Partnerships
Fort Worth metro extension (full City + N. Tarrant)~700,000~1,918Republic FW SE / privateRepublic + WM + City of FWConditionalStage 4 / Expanded
Waco metro extension (full City + S. McLennan)~110,000~300WM Lacy Lakeview / Republic MexiaWM + Republic + City of WacoConditionalStage 4 / Expanded
Partnership extension subtotal~810,000~2,218ConditionalStage 4 → Expanded
Total addressable (50-mi + Tier 3 extensions)~1,396,475~3,824All phases
Theoretical inferred universe~1,825,000~5,000InferredUNFC G-axis

§1.3Primary ACM Feedstocks (Phase Initial Priority)

Three streams have no contract barrier and are designated Phase Initial priority:

  • Hill County MSW (~70 TPD). Frontier Waste Solutions provides residential and commercial collection under typical short-term commercial contract structure with no long-term municipal lock-in. Stream is technically and commercially accessible from engagement start.
  • Hill County C&D residuals + industrial/commercial special (~25 TPD). Mixed-hauler streams with no incumbent contract concentration. Available to ACM upon site commissioning.
  • Hill County WWTP biosolids (~5 TPD). Conditional on city WWTP service agreement; modest scale; suitable as co-feed.

Combined Phase Initial accessible volume: ~100 TPD — exactly matching the user-specified Phase Initial deployment capacity. No third-party negotiation required for Phase Initial.

§1.4Full Feedstock Capability Statement

All listed streams are confirmed processable by ACM. Every Conditional classification in the volume table reflects one of three barriers:

  1. A third-party hauler or municipal contract requiring renegotiation or new instrument
  2. A multi-jurisdictional partnership pathway not yet executed (Tier 2 / Tier 3)
  3. A logistic transport increment to be confirmed during Term Sheet phase verification

None reflects a technical capability limit.

§1.5UNFC Feedstock Resource Classification

This section is the formal "ore body audit" — the G-axis (Source Uncertainty) characterisation supporting both the §5 Feedstock Opportunity sizing and any forward institutional financing collateral basis. Classification follows the United Nations Framework Classification for Resources (UNFC), Anthropogenic Resources category.

Proven Feedstock Reserve

$0 TPD. No CSA executed. The Hillsboro engagement is at intake — no signed contractual instrument exists yet.

Indicated Feedstock Resource

~100 TPD (~36,500 TPY). Hill County engagement pathway. Status: ESTIMATED. Instrument formalisation expected at MOU stage with City of Hillsboro and/or Hill County counterparties.

Inferred Feedstock Resource

~5,000 TPD (~1,825,000 TPY). Theoretical addressable universe — full 50-mile natural catchment plus Fort Worth and Waco metropolitan partnership extensions. Carbotura's Phase Expanded design (2,000 TPD) captures 40% of the inferred resource.

Granular Composition Breakdown — Inferred Resource Sources & UNFC G-Axis Ore Grade

Primary stream contributions to the inferred resource:

  • Residential MSW: ~1,900 TPD
  • Commercial MSW: ~1,200 TPD
  • Industrial / commercial special: ~700 TPD
  • C&D residuals: ~550 TPD
  • Industrial process residuals: ~430 TPD
  • Regional WWTP biosolids: ~220 TPD

Data source: US Census Bureau county-level estimates (2024); North Central Texas Council of Governments solid waste data; Texas Commission on Environmental Quality regional facility records; per-capita generation rate ~1.0 ton/year (Texas regional median).

Elemental Composition (UNFC G-Axis Ore Grade — ESTIMATED, Carbotura standard):

  • Carbon fraction: 35–45% (plastics + paper + organics)
  • Inorganic fraction: 30–40% (metals, glass, fines, ash)
  • Moisture content: 18–25%
  • Calorific value: 8–12 MJ/kg

Stream-specific characterisation deferred to Term Sheet phase verification MSW audit.

Classification Summary Table

Classification Volume (TPD) Volume (TPY) Basis Status
Proven Feedstock Reserve00Signed CSANone
Indicated Feedstock Resource~100~36,500Hill County engagement pathway, MOU pendingEstimated
Inferred Feedstock Resource~5,000~1,825,00050-mile catchment + partnership extensionsEstimated
Total Urban Mine~5,100~1,861,500Full addressable feedstockEstimated

§2 Logistics and Infrastructure

Hill County collection. Frontier Waste Solutions (101 Jennings Pkwy, Hillsboro) provides residential and commercial collection in Hillsboro and surrounding Hill County jurisdictions. Routes converge on Republic Itasca Landfill (2559 FM 66, Itasca) approximately 10 miles north of Hillsboro on FM 66 / I-35 — a 12-15 minute haul.

I-35 corridor as logistics spine. I-35 is a 4-lane interstate highway running north-south through the catchment, connecting Fort Worth (~60mi north of Hillsboro) to Waco (~36mi south). FM 66, FM 308, and FM 67 provide lateral access to Hill County feedstock origins. Republic Itasca Landfill is functionally a regional disposal hub already aggregating Hill County, Johnson County (Cleburne), and adjacent Ellis County waste flows.

Regional haul distances (from Hillsboro reference point)

  • Republic Itasca Landfill: 10 mi (~15 min)
  • WM Lacy Lakeview Landfill (Waco): 38 mi (~45 min)
  • Republic Mexia Landfill (Limestone County): 52 mi (~1h 5min)
  • Republic Fort Worth Southeast Landfill: 58 mi (~1h)

Transfer infrastructure. No municipal transfer station exists in Hillsboro — Hill County operates a direct-haul model. Both Fort Worth and Waco metropolitan areas operate transfer station networks (Fort Worth: four municipal drop-off centers; Waco: Cobbs Recycling Center plus municipal collection routing through Schroeder Drive facility).

Existing route convergence. Regional waste flow on the I-35 corridor already concentrates toward Republic Itasca Landfill from the north (Johnson County, southern Tarrant) and from Hill County itself. A Hillsboro-anchored ACM facility on the I-35 corridor is logistically aligned with these existing flows — feedstock redirection from gate to ACM is a route-distance reduction in most cases, not an extension.

§3 Cost Structure

§3.1Current System Cost Table

Cost Element Annual Year 1 Per-Ton Source Type
Hill County all-stream blended disposal cost~$2,975,000~$82Modeled
Republic Itasca LF gate tipping fee component~$32–42Estimated
Frontier Waste collection / transport increment~$40–50Estimated
Hill County MSW (residential + commercial)~$2,090,000~$82Estimated
Hill County C&D residuals~$385,000~$70Estimated
Hill County industrial / commercial special~$330,000~$90Estimated
City of Hillsboro WWTP biosolids disposal~$170,000~$95Estimated
5-year disposal rate escalation trajectory3.5%/yr (CPI + 1pp)Estimated
Finding — FWDC composition

A measurable gap exists between the gate-tipping fee Republic Services charges at the Itasca Landfill (~$32–42/ton estimated) and the full collector-facing rate the County and its commercial customers actually pay (~$82/ton blended). The collection, transport, and operator margin layered above the gate tipping fee constitute most of Hill County's Full Waste Disposal Cost. This gap widens at greater haul distances — relevant to Fort Worth and Waco partnership extensions where one-way haul distances exceed 50 miles.

§3.2Operators (verified)

  • Frontier Waste Solutions — Hillsboro residential and commercial collection contractor (101 Jennings Pkwy, Hillsboro). Operating relationship under typical Texas commercial collection contract structure; long-term lock-in not documented.
  • Republic Services, Inc. (NYSE: RSG) — Operates Itasca Landfill (Hill County), Mexia Landfill (Limestone County), and Fort Worth Southeast Landfill — three of four major regional disposal facilities serving the 50-mile catchment. Regional disposal corridor effectively under single corporate counterparty.
  • WM (Waste Management, Inc.) (NYSE: WM) — Operates Lacy Lakeview Landfill in Waco (677 Selby Ln, Waco) — fourth regional disposal facility; primarily serving Waco metro.
  • City of Hillsboro Water & Wastewater — Municipal WWTP operator; biosolids destination is land application or co-disposal (specific destination not publicly documented).
  • City of Fort Worth Solid Waste Services — Municipal collection via four drop-off centers; commercial waste routes to private disposal (Republic Fort Worth Southeast LF dominant).
  • City of Waco Solid Waste Services (501 Schroeder Dr, Waco) — Municipal collection routes to WM Lacy Lakeview and Republic Mexia.

Operator verification source: Google Places lookup (April 2026); corroborated against operator websites and public NYSE filings.

§3.3Cost Trajectory

Three documented mechanisms drive forward disposal cost growth in the Hillsboro Triangle:

  1. Rate escalation. Texas commercial waste contracts typically include CPI + 1 percentage point annual escalators. Republic Services and WM published 2024–2025 rate schedules show ~3.5–4.5%/yr increases for commercial customers in central Texas.
  2. Capital reinvestment pressure. Itasca, Mexia, Lacy Lakeview, and Fort Worth Southeast have all undergone or are scheduled for cell expansion projects 2024–2030 — capex passes through to gate rates.
  3. Absence of competitive alternatives. Republic Services controls 3 of 4 major catchment-area MSW landfills. This concentration creates pricing power. Smaller independent operators have largely exited central Texas through industry consolidation.
Throughput Reliability Note

Unlike a finite geological mine, Hill County's feedstock stream is a perpetually renewable resource — structurally stable or growing with regional population and economic activity.

  • 5-year historical waste generation trend. Hill County population growth 2019–2024 ≈ +2.1%/yr (US Census estimates). 50-mile catchment population growth ≈ +1.8%/yr (NCTCOG / Texas State Demographer projections). Per-capita waste generation flat to slightly increasing (TCEQ annual MSW reports).
  • 30-year projection basis. Texas State Demographer 2055 projection: Hill County +29% from 2024 (to ~47,000); Tarrant County +60%; McLennan County +25%; corridor aggregate +35–45% population growth through 2055.

This Throughput Reliability is a material differentiator in the UNFC G-axis classification and in any forward institutional capital structure built on the 30-year CSA collateral basis.

§4 Regulatory Baseline

Hill County operates under Texas Commission on Environmental Quality (TCEQ) jurisdiction per 30 TAC Chapter 330 (MSW Management Regulations). The Texas Solid Waste Disposal Act (Health & Safety Code Ch. 361) governs licensing and permit framework. No state-level diversion mandate or comprehensive extended producer responsibility law currently in force; House Bill 1331 (2023) introduced limited packaging EPR scope, not yet operational.

No active landfill closure orders identified in the immediate Hillsboro Triangle catchment. Republic Itasca, Republic Mexia, WM Lacy Lakeview, and Republic Fort Worth Southeast all hold valid operating permits with no documented near-term closure or capacity-exhaustion deadline.

Federal regulatory developments relevant to procurement window

  • EPA RCRA Subtitle D MSW landfill rules under review 2025–2026. Potential PFAS, leachate, and gas-collection rule tightening could elevate operating costs across all four regional landfills 2027–2029.
  • Manufacturing classification (NAICS 31–33). ACM facilities are classified as manufacturing (NAICS 325180, 325998, 327992, 331110, 331314, 331492), never solid waste (NAICS 562213/562219) — the federal basis for the Regulatory Predicate Transition (RPT) governing all Carbotura CSAs.
  • Industrial PFAS regulation. TCEQ has not issued Texas-specific PFAS rules; federal action expected 2026–2027 may impose treatment or destination changes for specific industrial waste streams in the catchment.
Action window framing

Hillsboro does not face a single hard regulatory deadline (unlike Hawaii's H-POWER closure or Saskatchewan's Moose Jaw landfill end-of-life). The procurement decision window is structural — driven by:

  • Republic Services regional disposal-pricing power and forward escalation trajectory
  • Manufacturing classification (NAICS 31–33) under the Regulatory Predicate Transition (RPT) — first-mover communities secure positioning advantages
  • Multi-jurisdictional partnership coordination (Fort Worth and Waco) requiring 18–24 months of intergovernmental work to mature — beginning that work now preserves Phase Expanded optionality

§5 Feedstock Opportunity

§5.1System-Wide Addressable Volume Summary

  • Total system volume in 50-mile catchment: ~5,000 TPD (~1,825,000 TPY) — UNFC Inferred Resource
  • Immediately accessible (no partnership required, IMMEDIATE classification): ~95 TPD (Hill County MSW + C&D + industrial special)
  • Conditionally accessible — Tier 2 (50-mile catchment with municipal partnership): ~1,506 TPD additional
  • Conditionally accessible — Tier 3 (Fort Worth + Waco metro extensions): ~2,218 TPD additional
  • Phase Expanded design (2,000 TPD) captures ~40% of total addressable universe

§5.2Addressability Table

Configuration Aggregate TPD Counterparty Set Access Class.
Phase Initial only100Hill County / City of HillsboroImmediate
Phase Initial + Stage 2200–400+ 1–2 adjacent counties (Ellis / Johnson / Bosque)Conditional
Phase Medium full400Tier 1 + Tier 2 partialConditional
Stage 41,000+ Fort Worth OR Waco partnershipConditional
Phase Expanded2,000+ Fort Worth AND Waco partnershipsConditional

§5.3Phase Configuration Preview

  • Conservative configuration (no third-party negotiation). Phase Initial 100 TPD — fully served by Hill County feedstock. Single CSA with City of Hillsboro / Hill County. Zero partnership dependency.
  • 50-mile natural catchment configuration. Stage 2 (200 TPD) and Phase Medium (400 TPD) require CSA additions or LOIs from one or more adjacent jurisdictions. Each addition is independent — no forced sequence. Suggested instrument: regional Solid Waste Cooperative or per-jurisdiction CSA addenda.
  • Full system addressable. Phase Expanded 2,000 TPD requires Fort Worth metropolitan partnership and/or Waco metropolitan partnership. Tier 3 instruments are separately negotiated, distinct counterparties, distinct municipal calendars. Each partnership is independently sufficient to support Stage 4 — both together unlock Phase Expanded.

§6 Infrastructure Map

Active and proposed waste management infrastructure across the 50-mile Hillsboro Triangle catchment. Use the filter bar to focus on specific facility types. Click any facility on the map or the right panel to highlight; selection is bidirectional.

Interactive map requires a Google Maps API key.

Set GOOGLE_MAPS_API_KEY in config.js.

Right panel facility list remains fully functional without a map key.

Source: Google Places verification (April 2026); operator websites; NYSE filings (RSG, WM); TCEQ facility records. Verification date: April 2026.

Headline

Waste Study · Hillsboro, Texas · April 2026

Hill County's I-35 position routes ~5,000 TPD of regional manufacturing feedstock to Republic-dominated disposal — with no contracted alternative pathway.

A Evidence Chain

Key figures and their public source verification.

Figure Value Public Source Source Type Confidence
Hill County population~36,500US Census Bureau 2024 estimatePublicEstimated
50-mile catchment population~700,000US Census Bureau county-level data + GIS overlayModeledEstimated
Republic Itasca LandfillActiveGoogle Places + Republic Services websitePublicVerified
Hill County MSW volume~25,500 TPYPer-capita generation (TCEQ regional median) × populationModeledEstimated
FWDC blended (Hillsboro Triangle)~$100/tonTexas regional gate rate median + collection incrementModeledEstimated
Texas commercial waste rate escalation3.5%/yrRepublic Services + WM 2024–2025 published rate schedulesPublicEstimated
Hill County 30-year population projection~47,000Texas State Demographer 2055 projectionPublicEstimated

B Change Factors

Five factors that would materially change the diagnostic findings in this Waste Study.

  1. Republic Services rate restructuring. Direction: ↑ FWDC. Mechanism: A unilateral rate increase or contract restructure by Republic Services in the Hillsboro Triangle catchment would elevate State A FWDC trajectory above the documented +3.5%/yr baseline, accelerating the procurement window.
  2. Federal PFAS rule promulgation. Direction: ↑ FWDC. Mechanism: EPA PFAS rules (expected 2026–2027) imposing treatment, destination, or destruction-efficiency requirements would step-change disposal costs for industrial and biosolids streams across all four catchment landfills.
  3. Itasca Landfill capacity event. Direction: ↑ FWDC, ↑ urgency. Mechanism: Cell-expansion delay or denial at Republic Itasca Landfill would force Hill County waste flows to longer-haul facilities (Mexia or Fort Worth Southeast), elevating per-ton costs and creating de facto capacity scarcity.
  4. Fort Worth or Waco municipal procurement decision. Direction: ↑ partnership opportunity. Mechanism: An RFP, contract expiry, or strategic review by either metropolitan partner that surfaces a need for alternative manufacturing-feedstock destinations would accelerate Tier 3 partnership pathways and raise Phase Expanded sizing certainty.
  5. Texas TCEQ rule change on industrial special waste. Direction: ↑ stream-specific FWDC. Mechanism: Texas-level industrial waste rule changes (heavy metals, PFAS, industrial residuals classification) would alter the stream-level cost trajectory for ~10 TPD of Hill County industrial special and ~700 TPD of regional industrial residual streams.

C Sources and References

Population and demographics

  • US Census Bureau — 2024 county population estimates (Hill, Bosque, Ellis, Johnson, Navarro, Tarrant, McLennan, Limestone Counties)
  • Texas State Demographer — 2024–2055 county-level population projections

Operator and facility data

  • Republic Services, Inc. — corporate website (republicservices.com); 2024 Annual Report (NYSE: RSG)
  • WM (Waste Management, Inc.) — corporate website (wm.com); 2024 Annual Report (NYSE: WM)
  • Frontier Waste Solutions — public business records
  • City of Hillsboro, City of Fort Worth, City of Waco — official municipal websites and posted service rates
  • Google Places verification (April 2026) — facility names, addresses, coordinates, operating hours

Regulatory framework

  • Texas Commission on Environmental Quality (TCEQ) — 30 TAC Chapter 330 (MSW Management Regulations)
  • Texas Solid Waste Disposal Act — Texas Health & Safety Code Chapter 361
  • US EPA — RCRA Subtitle D MSW landfill rules (proposed amendments under review 2025–2026)
  • North Central Texas Council of Governments (NCTCOG) — regional solid waste data and planning projections

D Authoritative Glossary

Full document-suite glossary. All terms remain consistent across Waste Study, Proposal, EIR, and Brief.

ACM (Advanced Circular Manufacturing)
Carbotura's manufacturing process platform converting waste streams into manufactured outputs via Microwave Catalytic Reforming.
Access Classification
Three-tier scheme for feedstock streams: IMMEDIATE (no contractual barrier), CONDITIONAL (instrument or partnership required), ACCESSIBLE (logistical or regulatory adjustment required).
Calorific Value
Energy content per unit mass of feedstock (MJ/kg). UNFC G-axis ore grade attribute.
Catchment
Geographic area within haul-economic distance of a Carbotura facility from which feedstock can be sourced.
Circular Supply Agreement (CSA)
30-year contract under which a counterparty commits feedstock and Carbotura commits manufacturing capacity. Defines Beneficiation Fee and Circular Royalty™.
Circular Royalty™
Payment from Carbotura to counterparty equal to 120% of contemporaneous Beneficiation Fee per ton (escalating +1pp/yr), paid 13 months in arrears on a rolling monthly basis. Formula: Royalty(m+13) = TMC(m) × Royalty_Rate(m).
Regulatory Predicate Transition (RPT)
Carbotura policy: a CSA cannot execute, capital cannot commit, and deployment cannot commence in any jurisdiction that classifies the ACM facility under solid waste NAICS (562213/562219) rather than manufacturing NAICS (325180, 325998, 327992, 331110, 331314, 331492). Federal basis: RCRA §1004(27) · 40 CFR §261.2(e).
Elemental Conversion Efficiency
Fraction of feedstock carbon and inorganic content converted to manufactured outputs in the ACM process.
Full Waste Disposal Cost (FWDC)
Total all-in current cost per ton of disposing of feedstock under the existing system: collection + transport + gate tipping fee + operator margin.
Indicated Feedstock Resource
UNFC tier: feedstock volume covered by signed MOU, LOI, or formal expression of interest. Not yet under CSA.
Inferred Feedstock Resource
UNFC tier: total annual waste generation in the target jurisdiction or region. Theoretical addressable universe.
MCR (Microwave Catalytic Reforming)
Anoxic, non-combustion conversion process used in ACM facilities. Classifies under manufacturing NAICS, not solid waste.
Phase Initial / Stage 2 / Phase Medium / Stage 4 / Phase Expanded
Hillsboro engagement deployment scaling pathway: 100 → 200 → 400 → 1,000 → 2,000 TPD over 60 months from Phase Initial COD.
Proven Feedstock Reserve
UNFC tier: feedstock volume legally committed under signed multi-year CSA feeding a commissioned or committed ACM facility. Highest-confidence classification.
Beneficiation Fee (Total Materials Conversion Fee)
Per-ton fee paid by counterparty to Carbotura for conversion arrangement. Hillsboro engagement base: $100/ton, escalating 2.5%/yr.
Throughput Reliability
UNFC G-axis attribute: structural stability or growth of feedstock supply over the CSA term, derived from population and economic activity rather than physical reserve depletion.
UNFC (United Nations Framework Classification for Resources)
International standard for resource classification accommodating both geological and anthropogenic resources. Used by UNECE; accepted by institutional investors and infrastructure lenders.

★ Basis of Presentation

This page presents diagnostic findings on the Hill County manufacturing-feedstock system and the surrounding 50-mile catchment. Each figure is classified by confidence tier. Final values for CSA execution will be confirmed during Term Sheet phase verification following procurement decision authorization.

Parameter Value Applied Basis Confidence
Phase Initial 100 TPD scaling pathway 100 → 200 → 400 → 1,000 → 2,000 TPD over 60mo User intake — engagement scoping Locked
Hill County total feedstock ~100 TPD / ~36,500 TPY US Census 2024 + Texas regional per-capita generation rate Estimated
Hill County FWDC (blended) ~$82/ton Texas regional gate rate median + collection/transport increment Estimated
50-mile catchment FWDC (blended) ~$100/ton Phase-weighted blend of Hill County / Fort Worth metro / Waco metro components Estimated
Inferred Feedstock Resource (UNFC G-axis) ~5,000 TPD / ~1,825,000 TPY 50-mi catchment + Tier 3 partnership extensions Estimated
Forward disposal escalation ~3.5%/yr (CPI + 1pp) Republic Services + WM published 2024–2025 rate schedules Estimated
Operator verification (5 facilities) Republic Services × 3, WM × 1, Frontier Waste × 1 Google Places lookup, April 2026 + NYSE filings Verified
Site candidates (P1, P2, P3) Three I-35 corridor zones identified Geographic and zoning analysis — pre-Term Sheet phase verification Provisional
Feedstock elemental composition Carbotura standard MSW profile (35–45% C; 30–40% inorganic; 18–25% moisture) Carbotura corpus standard; stream-specific characterization deferred Estimated

Unresolved Data Gaps

  • Hill County stream-specific FWDC composition — Frontier Waste and Republic Services contract terms not publicly documented; resolved during Term Sheet phase verification contract review.
  • City of Hillsboro WWTP biosolids destination specifics — service-agreement coordination required.
  • Texas TCEQ permit timeline specifics for ACM facility — pre-application engagement during Term Sheet phase verification.
  • Tier 3 partnership entity-specific commitments (Fort Worth / Waco) — inter-jurisdictional coordination 2026–2028.

Confidence tiers: Locked = user-confirmed or contractually binding Verified = sourced to public record at named verification date Estimated = Carbotura-modeled from public data with stated methodology Provisional = pre-Feasibility-Study placeholder.

Was this feedstock system assessment useful?
Indicative reference only — not an offer. All financial figures are Carbotura planning-basis estimates unless marked VERIFIED. The blended FWDC of $100/ton is ESTIMATED across the I-35 corridor — Hill County gate rates verify at $82/ton, Fort Worth metro at $108/ton and Waco metro at $95/ton. The Beneficiation Fee of $100/ton and all Circular Royalty™ figures are ESTIMATED on Carbotura standard parameters and subject to Term Sheet phase verification. Site options are PROVISIONAL. Phase Medium and Phase Expanded volumes assume regional partnership volumes that are not yet contracted. Assumption Registry LOCKED WITH WARNINGS, April 2026. The Beneficiation Fee and the Circular Royalty™ are independent gross transactions and are not netted or combined anywhere in this package.